ADR 0025: The orchestration coordination artifact — ownership, hand-off, liveness, merge-intent

Status

Superseded by 0039 — owned/forbidden paths become the write-surface model lowered by the lower/decompose passes (§18, §19), rather than a standalone orchestration object. The recorded-not-runtime stance is preserved. The original decision text below is kept as history (Nygard, §30.1: an accepted ADR is never edited in place; only this status line is added).

Context

The agents-as-compiler readiness audit found the multi-agent path — the framework's highest-stakes work — the least conditioned:

  • No self-activating surface (Finding 5): orchestration shipped no skill, so in a no-always-loaded-skills world (0017) an agent handed multiple source docs had nothing to fire the Lead Engineer discipline.
  • No recorded ownership (Finding 6): the disjoint-file-scope rule the entire write-side-parallel safety argument rests on lived only as prose; the worker tracker had no owned-paths field.
  • No hand-off contract (Finding 7): spawned workers inherited a generic task file, not lead-authored boundaries/objective/acceptance-bar — "vague subtask descriptions" is the field's named #1 multi-agent failure mode.
  • No liveness (Finding 8): the tracker's status enum was terminal-stages only; a worker hung in-progress or silently diverging was an invisible state.
  • Unverified merges (Finding 9): the merge protocol was ordering advice; a conflict resolution was re-tested only by a suite the docs admit can miss the interaction.

Decision

Two changes make multi-agent coordination conditioned and auditable:

  1. The Lead Engineer ships as a skillpersona-lead-engineer — with a directive description that self-activates on "multiple source docs / decompose and delegate / merge parallel branches." Orchestration is no longer the one task type with no in-session conditioning surface.
  2. The orchestration artifact records the coordination contract. task-orchestration.md's worker tracker carries per-worker owned / forbidden paths (the disjoint-scope contract — pairwise non-overlapping, confirmed before spawning), an expected-deliverable / acceptance-bar (the hand-off contract, inherited into each worker's ## Parent contract in task-base.md), and a last-progress marker with a stalled status and a documented stall→re-plan/re-scope/escalate/abandon action. The merge log carries an intent-preserved proof column for non-trivial conflicts.

These are recorded fields a reviewer (or a checker, 0026) can read — not a runtime. The disjoint-scope invariant becomes re-derivable from the artifact rather than held in the lead's head; a stalled worker becomes a detectable state; a hand-off becomes a contract.

Consequences

  • Positive: decomposition correctness (the property that makes parallel writes safe) is auditable and reconstructable from the task file alone.
  • Positive: the highest-stakes path is conditioned by the same self-activation mechanism as every single-agent path.
  • Positive: reopens nothing in 0010 — single-threaded writes still hold; this records how the lead decomposes and merges them.
  • Negative: more fields for the lead to maintain by hand; until a harness/checker validates them, disjointness and liveness are still lead-attested (the serial-merge + per-merge-validation backstop remains the safety net).

Alternatives rejected

  • Keep orchestration skill-less, discipline in the flat template only. The audit's Finding 5 — the multi-agent path is the only one with no in-session self-activation.
  • Record coordination state outside the task file (a separate ledger). Splits the resumption record; the task file is the single canonical record by 0004's logic.
  • A runtime scheduler that detects stalls automatically. Violates Principle 1 (no runtime); the framework records the contract (a liveness marker + threshold + action) a runtime could later automate.

Ready to run the loop on your own repo? Get started — copy the kit and write your first spec.